Fair deal Charter
Series: Contract Journal ; 402(6267) 8 March 2000, 1(1)Publication details: 2000Subject(s): Summary: A list of contractual benchmarks detailing the terms reflecting a fair balance of risk in all construction contracts has been compiled by the Specialist Engineering Contractors Group (SECG).| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3610-05 (Browse shelf(Opens below)) | 1 | Available | 104734-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3610-02 Right to roam code of conduct | WB3610-03 Industry tax scheme | WB3610-04 Cowboy builders | WB3610-05 Fair deal Charter | WB3610-06 MoD contracts worth £4.4bn | WB3610-07 Rehabilitation costs | WB3610-08 Thousands join warranty |
A list of contractual benchmarks detailing the terms reflecting a fair balance of risk in all construction contracts has been compiled by the Specialist Engineering Contractors Group (SECG).