Cutting out the flab
Series: Construction News ; (6658) 23 March 2000, 10-11(2)Publication details: 2000Subject(s): Summary: Explains the difficulties involved in putting lean construction into practice despite the scope it offers for reduced waste, increased profits and savings on whole-life costs.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS62018 (Browse shelf(Opens below)) | 1 | Available | 105007-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Explains the difficulties involved in putting lean construction into practice despite the scope it offers for reduced waste, increased profits and savings on whole-life costs.