Image from Google Jackets

Services whole-life costs: power and data installations

By: Series: Building ; 12 May 2000, 68-75(6)Publication details: 2000Subject(s): Summary: The third in a series on the lifespan costs of engineering services. Three power and data installation options are compared. Tables, diagrams and photographs.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62295 (Browse shelf(Opens below)) 1 Available 106299-1001

The third in a series on the lifespan costs of engineering services. Three power and data installation options are compared. Tables, diagrams and photographs.