The away game
Series: Building ; 265(8141) 16 June 2000, 67(1)Publication details: 2000Subject(s): Summary: Looks at the problems of international construction contracts, and the new FIDIC suite of international forms. The main points being that extension of time can only be granted in exceptional circumstances, and that profit is irrecoverable after force majeure.| Item type | Current library | Copy number | Status | Barcode | |
|---|---|---|---|---|---|
| Journal article | London Journal article | 1 | Available | 107629-1001 |
Looks at the problems of international construction contracts, and the new FIDIC suite of international forms. The main points being that extension of time can only be granted in exceptional circumstances, and that profit is irrecoverable after force majeure.