By: Series: Building ; 27(8144) 7 July 2000, 72-73(2)Publication details: 2000Subject(s): Summary: Points out the disparity between the way contractors and consultants are treated over delays. If a contractor fails to meet completion date its get charged with liquidated damages, whereas if a consultant is late it is harder to obtain damages. Argues that consultants and contractors should be treated the same.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62556 (Browse shelf(Opens below)) 1 Available 107630-1001

Points out the disparity between the way contractors and consultants are treated over delays. If a contractor fails to meet completion date its get charged with liquidated damages, whereas if a consultant is late it is harder to obtain damages. Argues that consultants and contractors should be treated the same.