Image from Google Jackets

A theoretical model for optimum project (time) performance based on European best practice

By: Contributor(s): Series: Construction Management and Economics ; (17) September 2000, 657-665(9)Publication details: 2000Subject(s): Summary: Reports on the results of extensive research into European construction contractor performance. Presents a model for achieving optimum project time performance based on best practice in France, Germany and the UK. References.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62786 (Browse shelf(Opens below)) 1 Available 107992-1001

Reports on the results of extensive research into European construction contractor performance. Presents a model for achieving optimum project time performance based on best practice in France, Germany and the UK. References.