Interim findings on Bristol project
Series: Estate Agent ; August 2000, 9(1)Publication details: 2000Subject(s): Summary: Looks at the government's interim findings on the seller's pack, currently being piloted in Bristol. Looks at how the seller's pack is working, length of time to assemble the pack, speed of transaction and demand for packs.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS62790 (Browse shelf(Opens below)) | 1 | Available | 108004-1001 |
Looks at the government's interim findings on the seller's pack, currently being piloted in Bristol. Looks at how the seller's pack is working, length of time to assemble the pack, speed of transaction and demand for packs.