Verbal remedies

By: Series: Building ; 265(8150) 18 August 2000, 52(1)Publication details: 2000Subject(s): Summary: Considers what can happen if a contractor carries out a variation on the basis of a verbal instruction and the employer's agent then claims that instructions are only valid if in writing.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62686 (Browse shelf(Opens below)) 1 Available 108018-1001

Considers what can happen if a contractor carries out a variation on the basis of a verbal instruction and the employer's agent then claims that instructions are only valid if in writing.