Image from Google Jackets

Prefab pioneer did not cut costs

Series: Building ; 265(8159) 27 October 2000, 12(1)Publication details: 2000Subject(s): Summary: A BRE Centre for Sustainable Construction report finds that although a pioneering Peabody Trust prefabricated housing development cost 5% more than a conventional scheme, it was faster to build, had zero defects and was popular with its tenants.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB3643-01 (Browse shelf(Opens below)) 1 Available 109048-1001

A BRE Centre for Sustainable Construction report finds that although a pioneering Peabody Trust prefabricated housing development cost 5% more than a conventional scheme, it was faster to build, had zero defects and was popular with its tenants.