No time to lose

By: Series: Building ; 265(8166) 15 December 2000, 71(1)Publication details: 2000Subject(s): Summary: Looks at the increasing risk contractors must bear on PFI projects with heavy liability for delays. Contractors should be aware of restrictions on the type of delay events for which they can claim; they should also ensure that the greater risk is reflected in the contract price and that they should consider extra insurance on top of their usual all-risks policy.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS63265 (Browse shelf(Opens below)) 1 Available 110301-1001

Looks at the increasing risk contractors must bear on PFI projects with heavy liability for delays. Contractors should be aware of restrictions on the type of delay events for which they can claim; they should also ensure that the greater risk is reflected in the contract price and that they should consider extra insurance on top of their usual all-risks policy.