Image from Google Jackets

Charter for change

By: Series: RIBA Journal ; 180(1) January 2001, 40-46(6)Publication details: 2001Subject(s): Summary: Looks at the refurbishment of the Charter School in Dulwich by architects Penoye and Prasad, a fast-track project undertaken in fourteen months with construction completed in eight. Explains the architects' philosophy of 'sustainable improvement', including the building's environmental strategy, together with their use of colour. Gives details of costs and a detailed section through the fabric of the entrance foyer.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS63371 (Browse shelf(Opens below)) 1 Available 110444-1001

Looks at the refurbishment of the Charter School in Dulwich by architects Penoye and Prasad, a fast-track project undertaken in fourteen months with construction completed in eight. Explains the architects' philosophy of 'sustainable improvement', including the building's environmental strategy, together with their use of colour. Gives details of costs and a detailed section through the fabric of the entrance foyer.