Charter for change
Series: RIBA Journal ; 180(1) January 2001, 40-46(6)Publication details: 2001Subject(s): Summary: Looks at the refurbishment of the Charter School in Dulwich by architects Penoye and Prasad, a fast-track project undertaken in fourteen months with construction completed in eight. Explains the architects' philosophy of 'sustainable improvement', including the building's environmental strategy, together with their use of colour. Gives details of costs and a detailed section through the fabric of the entrance foyer.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS63371 (Browse shelf(Opens below)) | 1 | Available | 110444-1001 |
Looks at the refurbishment of the Charter School in Dulwich by architects Penoye and Prasad, a fast-track project undertaken in fourteen months with construction completed in eight. Explains the architects' philosophy of 'sustainable improvement', including the building's environmental strategy, together with their use of colour. Gives details of costs and a detailed section through the fabric of the entrance foyer.