Extensions of time down to the architects

By: Series: Construction News ; (6705) 1 March 2001, 14(1)Publication details: 2001Subject(s): Summary: In standard construction contracts the contractor is allowed an extension of time for certain specified events. Considers the obligation of the architect who decides if and what extension of time is due. Examines "Royal Brompton Hospital NHS Trust v Watkins Gray International" (2000) which centred around a claim by the hospital that W was in breach of contract, or negligent in granting extensions of time. The hospital's claims were dismissed because its allegations of Ws performance had not been considered by an independent architect.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS63531 (Browse shelf(Opens below)) 1 Available 111236-1001

In standard construction contracts the contractor is allowed an extension of time for certain specified events. Considers the obligation of the architect who decides if and what extension of time is due. Examines "Royal Brompton Hospital NHS Trust v Watkins Gray International" (2000) which centred around a claim by the hospital that W was in breach of contract, or negligent in granting extensions of time. The hospital's claims were dismissed because its allegations of Ws performance had not been considered by an independent architect.