Time limitation on claims
Series: Contract Journal ; 407(6316) 25(1)Publication details: 2001Subject(s): Summary: Examines limitations of time within which claims for breach of contract or negligence must be brought. Reviews "New Islington and Hackney Housing Association ltd v Pollard Thomas & Edwards Ltd" 2000 concerning the liability of the architect in either contract or tort for alleged defective design accrued at the date of practical completion at the latest. ITEM MISSING| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS63532 (Browse shelf(Opens below)) | 1 | Available | 111240-1001 |
Examines limitations of time within which claims for breach of contract or negligence must be brought. Reviews "New Islington and Hackney Housing Association ltd v Pollard Thomas & Edwards Ltd" 2000 concerning the liability of the architect in either contract or tort for alleged defective design accrued at the date of practical completion at the latest. ITEM MISSING