Image from Google Jackets

Term report

By: Series: Surveyor ; 188(5629) 3 May 2001, 13-15(3)Publication details: 2001Subject(s): Summary: With the DETR's final assessment of local transport plans now complete, the Technical Adviser's Group (TAG) reports back on the process of developing local transport plans (LTPs) to date, and discusses the issues surrounding government's 10 year transport plan. Suggests that clear guidelines are required for the next LTPs and that the process should be transparent, with enough consultation. Sets out the main challenges that local authorities will face when delivering integrated transport, which include competition between different forms of transport and lack of integration between strategic objectives, and suggests possible solutions.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS64074 (Browse shelf(Opens below)) 1 Available 112610-1001

With the DETR's final assessment of local transport plans now complete, the Technical Adviser's Group (TAG) reports back on the process of developing local transport plans (LTPs) to date, and discusses the issues surrounding government's 10 year transport plan. Suggests that clear guidelines are required for the next LTPs and that the process should be transparent, with enough consultation. Sets out the main challenges that local authorities will face when delivering integrated transport, which include competition between different forms of transport and lack of integration between strategic objectives, and suggests possible solutions.