Lead times
Series: Building ; 266(8191) 29 June 2001, 58-61(4)Publication details: 2001Subject(s): Summary: Tracks the lead times of 38 works packages, reporting that only those for demountable partitions, LV switchgear and raised floors have fallen, whilst those for escalators and steel frames have remained the same. Lead times for curtain walling, data and voice cabling, ductwork, generators mechanical packages, metal windows, precast concrete frames, piling and uninterruptible power supply have all gone up. Focuses on the number of enquiries received by manufacturers, lead times, order levels and tender prices for structural steel frames.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS64101 (Browse shelf(Opens below)) | 1 | Available | 113567-1001 |
Tracks the lead times of 38 works packages, reporting that only those for demountable partitions, LV switchgear and raised floors have fallen, whilst those for escalators and steel frames have remained the same. Lead times for curtain walling, data and voice cabling, ductwork, generators mechanical packages, metal windows, precast concrete frames, piling and uninterruptible power supply have all gone up. Focuses on the number of enquiries received by manufacturers, lead times, order levels and tender prices for structural steel frames.