Supplement: Channel Tunnel Rail Link

By: Contributor(s): Series: New Civil Engineer Supplement ; 28 June 2001, 1-34(27) LOANPublication details: 2001Subject(s): Summary: Special supplement on the Channel Tunnel Rail Link which is currently under construction. Section One, from Folkestone to Fawkham Junction in Kent, is due for completion in October 2003 at a cost of £1.7bn whilst the more complex £3.3bn Section Two, featuring two 20 km tunnels under east London will open in 2007. Describes the engineering challenges of each of the key points along the route between St Pancras and Ebbsfleet and summarises some of the problems and environmental concerns encountered and solved in Section One.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS64207 (Browse shelf(Opens below)) 1 Available 113633-1001

Special supplement on the Channel Tunnel Rail Link which is currently under construction. Section One, from Folkestone to Fawkham Junction in Kent, is due for completion in October 2003 at a cost of £1.7bn whilst the more complex £3.3bn Section Two, featuring two 20 km tunnels under east London will open in 2007. Describes the engineering challenges of each of the key points along the route between St Pancras and Ebbsfleet and summarises some of the problems and environmental concerns encountered and solved in Section One.