Image from Google Jackets

Bearing up

By: Series: Surveyor ; 188(5644) 16 August 2001, 20-21(2)Publication details: 2001Subject(s): Summary: Examines the method used to strengthen the Baydon Road over bridge over the M4. The work was carried out without having to close the M4 below.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS64325 (Browse shelf(Opens below)) 1 Available 114429-1001

Examines the method used to strengthen the Baydon Road over bridge over the M4. The work was carried out without having to close the M4 below.