Building barriers
Series: Construction News ; (6747) 20 December 2001, 24-25(2)Publication details: 2001Subject(s): Summary: Examines the flood protection schemes which are being assessed at the moment. The first second tranche of schemes which includes a river protection works at Yarm and Wakefield is programmed to finish by November 2002. Explains the financial details of such schemes with framework arrangements seen by the Environment Agency as the favoured way to control the tight cash flow required by the many schemes. It also aids all the parties working together towards a common objective.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS64901 (Browse shelf(Opens below)) | 1 | Available | 116188-1001 |
Examines the flood protection schemes which are being assessed at the moment. The first second tranche of schemes which includes a river protection works at Yarm and Wakefield is programmed to finish by November 2002. Explains the financial details of such schemes with framework arrangements seen by the Environment Agency as the favoured way to control the tight cash flow required by the many schemes. It also aids all the parties working together towards a common objective.