Image from Google Jackets

Building barriers

By: Series: Construction News ; (6747) 20 December 2001, 24-25(2)Publication details: 2001Subject(s): Summary: Examines the flood protection schemes which are being assessed at the moment. The first second tranche of schemes which includes a river protection works at Yarm and Wakefield is programmed to finish by November 2002. Explains the financial details of such schemes with framework arrangements seen by the Environment Agency as the favoured way to control the tight cash flow required by the many schemes. It also aids all the parties working together towards a common objective.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS64901 (Browse shelf(Opens below)) 1 Available 116188-1001

Examines the flood protection schemes which are being assessed at the moment. The first second tranche of schemes which includes a river protection works at Yarm and Wakefield is programmed to finish by November 2002. Explains the financial details of such schemes with framework arrangements seen by the Environment Agency as the favoured way to control the tight cash flow required by the many schemes. It also aids all the parties working together towards a common objective.