A better way to sort out delays
Series: Construction News ; (6748) 10 January 2002, 12(1)Publication details: 2002Subject(s): Online resources: Summary: Discusses the draft protocol for determining extensions of time and compensation for delay and disruption produced by the Society of Construction Law. Considers the aim of the protocol to provide guidance to all parties involved in a dispute over matters of timing. The protocol concentrates on the programme, which is always under scrutiny when there are disputes over delay or disruption. The protocol is available to download from www.eotprotocol.com.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS65022 (Browse shelf(Opens below)) | 1 | Available | 116662-1001 |
Discusses the draft protocol for determining extensions of time and compensation for delay and disruption produced by the Society of Construction Law. Considers the aim of the protocol to provide guidance to all parties involved in a dispute over matters of timing. The protocol concentrates on the programme, which is always under scrutiny when there are disputes over delay or disruption. The protocol is available to download from www.eotprotocol.com.