The EC Harris/"Construction News" Contractors' input cost index
Series: Construction News ; (6784) 19 September 2002, 15(1)Publication details: 2002Subject(s): Summary: The index shows for the first time in five years, materials prices have grown almost as fast as labour costs. Contractors' input costs in the UK rose by 7.2% on average in the year to September 2002, while labour rates rose 8.6% and material costs were 6.2% higher. Graphs. Table.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS66009 (Browse shelf(Opens below)) | 1 | Available | 120197-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
The index shows for the first time in five years, materials prices have grown almost as fast as labour costs. Contractors' input costs in the UK rose by 7.2% on average in the year to September 2002, while labour rates rose 8.6% and material costs were 6.2% higher. Graphs. Table.