Resolving work breakdown structure problems
Series: Cost Engineer ; 40(4) September 2002, 17-21(4)Publication details: 2002Subject(s): Summary: Looks at work breakdown structure (WBS) problems and solutions in two areas: implementing a project management software system and creating the WBS for a project. Also takes a broader look at improving the scop, schedule and cost in the project management system.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS66098 (Browse shelf(Opens below)) | 1 | Available | 120251-1001 |
Looks at work breakdown structure (WBS) problems and solutions in two areas: implementing a project management software system and creating the WBS for a project. Also takes a broader look at improving the scop, schedule and cost in the project management system.