Delay and disruption - reducing delays
Series: Cost Engineer ; 41(4) July 2003, 12-14(3)Publication details: 2003Subject(s):- MITIGATION OF LOSS
- DELAY
- DISRUPTION
- BRITISH WESTINGHOUSE CO V UNDERGROUND ELECTRIC RAILWAYS
- WHITE AND CARTER (COUNCILS) LTD V MCGREGOR
- DIMOND V LOVELL
- GARMAC GRAIN CO V FAIRE AND FAIRCLOUGH
- ASCON CONTRACTING LTD V ALFRED MCALPINE CONSTRUCTION (ISLE OF MAN)
- MOTHERWELL BRIDGE CONSTRUCTION LTD V MICAFIL VAKUUMTECHNIK
- DSND SUBSEA LTD V PETROLEUM GEO SERVICES ASA (PGS)
- MIDLAND LAND RECLAMATION LTD V WARREN ENERGY LTD
- TERRELL V MABIE TODD AND CO
- BUILT ENVIRONMENT-BUILDING CONTRACT FORMS
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS67029 (Browse shelf(Opens below)) | 1 | Available | 123837-1001 |
The third in a series this article looks at various aspects of delay, such as the nature of the requirement to reduce delays, mitigation of loss, mitigation of delay, the obligation to mitigate delay or to progress the works. Relates the concept to various forms of contract. (See also Abs66572 and Abs66802).