Recovery rate
Series: New Civil Engineer ; 18 November 2004, 27(1)Publication details: 2004Subject(s): Summary: Reports on the new ICE Demolition Protocol which aims to minimise construction waste by mapping out how materials can be recovered from demolition and specified in new building projects.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS68586 (Browse shelf(Opens below)) | 1 | Available | 128300-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Reports on the new ICE Demolition Protocol which aims to minimise construction waste by mapping out how materials can be recovered from demolition and specified in new building projects.