Image from Google Jackets

Whole-life costs

By: Language: English Series: Building ; 279(8373) 18 March 2005, 78-83(6)Publication details: 2005Subject(s): Summary: The first in a series of articles on cost modelling and morphology. Uses a cost model to integrate capital, energy and maintenance costs to consider whole-life costs of primary schools in response to recent advancements of school design. Includes different scenarios on capital and energy costs such as the expense involved in the increase in ceiling height and glazing and the repair and maintenance costs in adding another floor and reducing the footprint.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L129362 (Browse shelf(Opens below)) 1 Available 129362-1001

The first in a series of articles on cost modelling and morphology. Uses a cost model to integrate capital, energy and maintenance costs to consider whole-life costs of primary schools in response to recent advancements of school design. Includes different scenarios on capital and energy costs such as the expense involved in the increase in ceiling height and glazing and the repair and maintenance costs in adding another floor and reducing the footprint.