Image from Google Jackets

Access and scaffolding

Language: English Series: Contract Journal ; 429(6531) 21-29(8)Publication details: 2005Subject(s): Summary: Special report on access and scaffolding. Includes reports on the Work at Height Regulations 2005, changes to edge protection standards and an analysis of the ongoing facelift of St Paul's Cathedral which has required an elaborate construction of scaffolding.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L130227 (Browse shelf(Opens below)) 1 Available 130227-1001

Special report on access and scaffolding. Includes reports on the Work at Height Regulations 2005, changes to edge protection standards and an analysis of the ongoing facelift of St Paul's Cathedral which has required an elaborate construction of scaffolding.