Image from Google Jackets

The co-ordination of building services drawings

By: Language: English Series: Contract Journal ; 431(6551) 16 November 2005 37(1)Publication details: 2005Subject(s): Summary: Describes and comments upon "Emcor Drake and Scull Ltd v Edinburgh Royal Joint Venture and others" ([2005] ScotCS CSOH134, unreported), where a dispute arose over whether building services drawings described as fully co-ordinated and approved for construction were in fact ready for installation. It was decided that in this instance, there were two stages of drawing co-ordination and despite the use of the words fully co-ordinated, design installation input was still required from the specialist sub-contractor.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L131628 (Browse shelf(Opens below)) 1 Available 131628-1001

Describes and comments upon "Emcor Drake and Scull Ltd v Edinburgh Royal Joint Venture and others" ([2005] ScotCS CSOH134, unreported), where a dispute arose over whether building services drawings described as fully co-ordinated and approved for construction were in fact ready for installation. It was decided that in this instance, there were two stages of drawing co-ordination and despite the use of the words fully co-ordinated, design installation input was still required from the specialist sub-contractor.