Image from Google Jackets

Datafile whole-life costs

By: Language: English Series: Building ; 270(8412) 6 January 2006, 56-60(5)Publication details: 2006Subject(s): Summary: Examines the differences in capital, energy, and repair and maintenance costs between a shallow-plan design for a compact school site and a deeper plan with atrium or courtyard. Contains graphs and tables.
Holdings
Item type Current library Call number Copy number Status Barcode
Archive London Journal article L132103 (Browse shelf(Opens below)) 1 Available 132103-1001

Examines the differences in capital, energy, and repair and maintenance costs between a shallow-plan design for a compact school site and a deeper plan with atrium or courtyard. Contains graphs and tables.