Stop right there
Language: English Series: Building ; 271(8431) 19 May 2006, 64-65(2)Publication details: 2006Subject(s):- FIDIC CONDITIONS OF CONTRACT FOR CONSTRUCTION FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE EMPLOYER (1999 EDITION)
- FIDIC CONDITIONS OF CONTRACT FOR PLANT AND DESIGN-BUILD FOR ELECTRICAL AND MECHANICAL PLANT AND FOR BUILDING AND ENGINEERING WORKS DESIGNED BY THE CONTRACTOR 1999 EDITION
- FIDIC CONDITIONS OF CONTRACT FOR EPC/TURNKEY PROJECTS 1999 EDITION
- United Kingdom --
- BUILT ENVIRONMENT-BUILDING CONTRACT FORMS-STANDARD FORMS OF BUILDING CONTRACT-INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS CONTRACTS
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L133634 (Browse shelf(Opens below)) | 1 | Available | 133634-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Argues that the scope and responsibilities of the dispute adjudication boards, established by the FIDIC conditions of contract to prevent problems escalating into disputes, are potentially extremely wide. Briefly examines a range of possible situations where the board could decide to intervene.