Whole-life costs concrete vs steel
Language: English Series: Building ; 271(8436) 23 June 2006, 82-88(7)Publication details: 2006Subject(s): Summary: Evaluates the environmental, capital cost and lifetime cost differences between a steel and concrete frame office building. Contains tables, bar charts and costings.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L133981 (Browse shelf(Opens below)) | 1 | Available | 133981-1001 |
Evaluates the environmental, capital cost and lifetime cost differences between a steel and concrete frame office building. Contains tables, bar charts and costings.