Image from Google Jackets

Keeping track of trade prices

By: Language: English Series: Contract Journal ; 440(6644) 26 September 2007, 8(1)Publication details: 2007Subject(s): Summary: Reports on the cost increases of key trades over the last 10 years, using BCIS data. In particular, explains why certain trades (such as contractor-designed precast concrete, excavation, insulation, and plumbing) have risen in price much less, or more than the general trend. Table shows 10 year movement in key trade prices 1996-2006. Graphs show raw materials by type, input costs versus BCIS All-in Tender Price Index and BCIS All-in Tender Price versus RPI.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L140611 (Browse shelf(Opens below)) 1 Available 140611-1001

Reports on the cost increases of key trades over the last 10 years, using BCIS data. In particular, explains why certain trades (such as contractor-designed precast concrete, excavation, insulation, and plumbing) have risen in price much less, or more than the general trend. Table shows 10 year movement in key trade prices 1996-2006. Graphs show raw materials by type, input costs versus BCIS All-in Tender Price Index and BCIS All-in Tender Price versus RPI.