Dealing with delay claims

By: Language: English Series: Contract Journal ; 440(6643) 19 September 2007, 48(1)Publication details: 2007Subject(s): Summary: Examines revisions in the JCT Standard Building Sub Contract (2005). Subcontractors now need to provide much more detail of all their claims. Previously they had been able to simply provide a gross figure. Also considers extension of time claims, late performance or failure to perform by the subcontractor.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L140818 (Browse shelf(Opens below)) 1 Available 140818-1001

Examines revisions in the JCT Standard Building Sub Contract (2005). Subcontractors now need to provide much more detail of all their claims. Previously they had been able to simply provide a gross figure. Also considers extension of time claims, late performance or failure to perform by the subcontractor.