Mountain rescue
Language: English Series: RIBA Journal ; 115(2) February 2008, 52-58(6)Publication details: 2008Subject(s): Summary: Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L142324 (Browse shelf(Opens below)) | 1 | Available | 142324-1001 |
Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.