Image from Google Jackets

Mountain rescue

By: Language: English Series: RIBA Journal ; 115(2) February 2008, 52-58(6)Publication details: 2008Subject(s): Summary: Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L142324 (Browse shelf(Opens below)) 1 Available 142324-1001

Reports on the design, architecture and costing of Everest Community College in Basingstoke. Contains brief building costs, layout plans and specifications. The total cost was £21 532 368.