Image from Google Jackets

Lead times Nov 2007-Feb 2008

By: Language: English Series: Building ; 273(8516) 15 February 2008, 68-69(2)Publication details: 2008Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L142627 (Browse shelf(Opens below)) 1 Available 142627-1001

Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.