Lead times Nov 2007-Feb 2008
Language: English Series: Building ; 273(8516) 15 February 2008, 68-69(2)Publication details: 2008Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L142627 (Browse shelf(Opens below)) | 1 | Available | 142627-1001 |
Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between November 2007 and February 2008 saw a return to more normal lead times, with eight packages reducing their lead times and only four reporting a rise. This is partly due to the number of major projects being deferred or delayed.