Image from Google Jackets

Cost model laboratories

By: Contributor(s): Language: English Series: Building ; 273(8517) 22 February 2008, 68-75(8)Publication details: 2008Subject(s): Summary: Looks at the key issues and costing involved in the construction of laboratories. Outlines key design issues, the practical planning of laboratory facilities, servicing strategies for laboratories, sustainability, and cost drivers. The cost model breakdown is based on a university-funded research laboratory, with a gross floor area of 12 600m2.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L142648 (Browse shelf(Opens below)) 1 Available 142648-1001

Looks at the key issues and costing involved in the construction of laboratories. Outlines key design issues, the practical planning of laboratory facilities, servicing strategies for laboratories, sustainability, and cost drivers. The cost model breakdown is based on a university-funded research laboratory, with a gross floor area of 12 600m2.