Lead times February-April 2008

By: Language: English Series: Building ; 273(8523) 4 April 2008, 82-83(2)Publication details: 2008Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between February and April 2008 saw a stabilisation of workload, with only three packages reporting a decrease in lead times and three packages reporting an increase. Staff shortages in the areas of project management, estimating and specialist design have been reported by the specialist contractors.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L143167 (Browse shelf(Opens below)) 1 Available 143167-1001

Gives details of lead times for various products, including piling, concrete works, structural steel frames, cladding and roofing. The period between February and April 2008 saw a stabilisation of workload, with only three packages reporting a decrease in lead times and three packages reporting an increase. Staff shortages in the areas of project management, estimating and specialist design have been reported by the specialist contractors.