Image from Google Jackets

PCT or RD?

By: Language: English Series: Building Engineer ; 83(8) August 2008, 12-13(2)Publication details: 2008Subject(s): Summary: Analyses the possibilities that a developer has to demonstrate compliance to Building Regulations part E - requirements for sound insulation between buildings - by choosing between Pre-Completion Testing (PCT) and Robust Detail (RD). Discusses the advantages of each procedure and shows why the choices continue through to product selection. Presents two case studies from Oak Tree Developments and Countryside Properties companies.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L144943 (Browse shelf(Opens below)) 1 Available 144943-1001

Analyses the possibilities that a developer has to demonstrate compliance to Building Regulations part E - requirements for sound insulation between buildings - by choosing between Pre-Completion Testing (PCT) and Robust Detail (RD). Discusses the advantages of each procedure and shows why the choices continue through to product selection. Presents two case studies from Oak Tree Developments and Countryside Properties companies.