Predicting medium term cost escalation
Language: English Series: Building Economist ; March 1996, 8-10(3)Publication details: 1996Subject(s): Summary: Considers factors to be taken into consideration by the estimator when attempting to predict the amount of escalation in cost between the estimate preparation and the bid date. Covers tools such as the Labour and Materials Index (LMI), construction cycles and Tender Index. Case study. References.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS54871 (Browse shelf(Opens below)) | 1 | Available | 12672-1001 |
Considers factors to be taken into consideration by the estimator when attempting to predict the amount of escalation in cost between the estimate preparation and the bid date. Covers tools such as the Labour and Materials Index (LMI), construction cycles and Tender Index. Case study. References.