Lead times November 08-January 2009
Language: English Series: Building ; 274(8565) 6 February 2009, 55-56 (2)Publication details: 2009Subject(s): Summary: Reports that some contractors are reducing lead times to levels not experienced since 2003. This is done as a reaction to having less workload, a result of the recession. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L146711 (Browse shelf(Opens below)) | 1 | Available | 146711-1001 |
Reports that some contractors are reducing lead times to levels not experienced since 2003. This is done as a reaction to having less workload, a result of the recession. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.