Image from Google Jackets

Lead times November 08-January 2009

By: Language: English Series: Building ; 274(8565) 6 February 2009, 55-56 (2)Publication details: 2009Subject(s): Summary: Reports that some contractors are reducing lead times to levels not experienced since 2003. This is done as a reaction to having less workload, a result of the recession. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L146711 (Browse shelf(Opens below)) 1 Available 146711-1001

Reports that some contractors are reducing lead times to levels not experienced since 2003. This is done as a reaction to having less workload, a result of the recession. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.