Orders for new construction
Language: English Series: DOE Information Bulletin ; (202) 24 March 1993(10)Publication details: (202) 24 March 1993(10)Subject(s): Summary: In the three months between November 1992 and January 1993 total orders received by contractors for construction work were 4% higher than in the previous three months but 1% lower than in the period November 1991 to January 1992.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2912-05 (Browse shelf(Opens below)) | 1 | Available | 12708-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2912-02 Construction industry squeeze | WB2912-03 Dutch auctioning | WB2912-04 Letters of intent | WB2912-05 Orders for new construction | WB2912-06 Signs of recovery | WB2912-07 Retention monies | WB2912-08 Timber-framed houses |
In the three months between November 1992 and January 1993 total orders received by contractors for construction work were 4% higher than in the previous three months but 1% lower than in the period November 1991 to January 1992.