Lead times April-June 2009
Language: English Series: Building ; 274 (8602) 23 October 2009, 52-53 (2)Publication details: 2009Subject(s): Summary: Reports that there is no increase in works packages but on the opposite seven works packages have fallen. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L148841 (Browse shelf(Opens below)) | 1 | Available | 148841-1001 |
Reports that there is no increase in works packages but on the opposite seven works packages have fallen. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.