Image from Google Jackets

Lead times April-June 2009

By: Language: English Series: Building ; 274 (8602) 23 October 2009, 52-53 (2)Publication details: 2009Subject(s): Summary: Reports that there is no increase in works packages but on the opposite seven works packages have fallen. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L148841 (Browse shelf(Opens below)) 1 Available 148841-1001

Reports that there is no increase in works packages but on the opposite seven works packages have fallen. Gives details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.