Pressure on Eurotunnel
Language: English Series: Times ; 23 January 1992, 212&23(2)Publication details: 1992Subject(s): Summary: In "Channel Tunnel Group Ltd and France Manche SA v Balfour Beatty Construction Ltd and others", CA 22 January 1992, Eurotunnel suffered a legal setback when an earlier judgement was overturned and allowed the builder to down tools on one part of the contract, the installation of the cooling system.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Law report | London Journal article | WB2804-07 (Browse shelf(Opens below)) | 1 | Available | 12927-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2803-36 Lease or licence | WB2803-55 Landlord : duty of care | WB2803-60 Joint venture agreement | WB2804-07 Pressure on Eurotunnel | WB2804-08 Set-off plea | WB2804-40 Sub-leases damages | WB2804-41 Case to be struck out for delay |
In "Channel Tunnel Group Ltd and France Manche SA v Balfour Beatty Construction Ltd and others", CA 22 January 1992, Eurotunnel suffered a legal setback when an earlier judgement was overturned and allowed the builder to down tools on one part of the contract, the installation of the cooling system.