Image from Google Jackets

Lead times July-September 2011

By: Language: English Series: Building ; 276 (8700) 12 October 2011, 50-51(2)Publication details: 2011Subject(s): Summary: Lead times remain overwhelmingly stable; growth in tower construction in London will affect capacity in steel fabrication, vertical transportation and cladding; summary, staying level and moving up, product lead time in weeks.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L154176 (Browse shelf(Opens below)) 1 Available 154176-1001

Lead times remain overwhelmingly stable; growth in tower construction in London will affect capacity in steel fabrication, vertical transportation and cladding; summary, staying level and moving up, product lead time in weeks.