Image from Google Jackets

The effects of BIM

By: Language: English Series: Building ; 277 (8735) 6 July 2012, 50(1)Publication details: 2012Subject(s): Summary: Looks at the increase in collaborative technology and how it can result in lower lead times particularly for trades involved in off-site manufacture.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L156762 (Browse shelf(Opens below)) 1 Available 156762-1001

Looks at the increase in collaborative technology and how it can result in lower lead times particularly for trades involved in off-site manufacture.