Image from Google Jackets

BIM the inside story one year on

By: Language: English Series: Building ; 277 (8737) 20 July 2012, 32-37(6)Publication details: 2012Subject(s): Summary: Looks at progress on the Manchester Central Library refurbishment project which commenced July 2011 and was to use BIM from start to finish. Views from the client, the contractor, the QS, the design team and the specialist.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L156861 (Browse shelf(Opens below)) 1 Available 156861-1001

Looks at progress on the Manchester Central Library refurbishment project which commenced July 2011 and was to use BIM from start to finish. Views from the client, the contractor, the QS, the design team and the specialist.