Scheduling techniques for different project classifications
Language: English Series: Project Control Professional ; 54(2) March 2016, 17-23(7)Publication details: 2016Subject(s): LOC classification:- 690.0685
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L159227 (Browse shelf(Opens below)) | 1 | Available | 159227-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Outlines different scheduling methods from the construction industry, and through research and an industry survey, the most appropriate scheduling technique is aligned in a matrix to each differing life-cycle stage and project classification.