Image from Google Jackets

Target and cost-reimbursable construction contracts, Part C: preparation of contract conditions (relating to the ICE Conditions

By: Contributor(s): Language: English Series: Report ; 85 Part CPublication details: London Construction Industry Research and Infor 1982Description: 42p. 30cmLOC classification:
  • 692.8
Holdings
Item type Current library Call number Copy number Status Barcode
Book London Folio F692.8 (Browse shelf(Opens below)) 3 Available 30047399