Definition of prime cost of daywork carried out under a building contract.

By: Contributor(s): Language: English Publication details: London RICS 1975Edition: 2ndDescription: 8p. 21cmISBN:
  • 0854060596
Subject(s): LOC classification:
  • 692.8 $2 18
Summary: Became operative on 1 December 1975. (See also Chartered Quantity Surveyor 1(5) May 1979, 55 for an updated version of the example printed on p8 of the definition of the calculation of the standard hourly base rate as defined in section three for a typical building craft operative and labour in NJCBI Grade A areas as at 1 January 1979).Summary: Superseded by third edition (L138499).
Holdings
Item type Current library Call number Copy number Status Barcode
Book London RICS Boxes RICS 1975/22 (Browse shelf(Opens below)) 5 Available 30071188
Reference material London RICS Boxes RICS 1975/22 (Browse shelf(Opens below)) 3 Available 30041741
Book London RICS Boxes RICS 1975/22 (Browse shelf(Opens below)) 4 Available 30041742
Book London RICS Boxes RICS 1975/22 (Browse shelf(Opens below)) 1 Available 30009474
Reference material London RICS Boxes RICS 1975/22 (Browse shelf(Opens below)) 2 Available 30027808

Became operative on 1 December 1975. (See also Chartered Quantity Surveyor 1(5) May 1979, 55 for an updated version of the example printed on p8 of the definition of the calculation of the standard hourly base rate as defined in section three for a typical building craft operative and labour in NJCBI Grade A areas as at 1 January 1979).

Superseded by third edition (L138499).