Image from Google Jackets

Definition of prime cost of daywork carried out under an electrical contract.

By: Language: English Publication details: London RICS 1969Description: 4p. 21cmSubject(s): LOC classification:
  • 338.4369 $2 18
Summary: SUPERSEDED: Replaced by 2nd edition (RICS 1981/84).
Holdings
Item type Current library Call number Copy number Status Barcode
Reference material London RICS Boxes RICS 1969/5 (Browse shelf(Opens below)) 2 Available 30005775
Reference material London RICS Boxes RICS 1969/5 (Browse shelf(Opens below)) 3 Available 30028106
Reference material London RICS Boxes RICS 1969/5 (Browse shelf(Opens below)) 1 Available 30005771

SUPERSEDED: Replaced by 2nd edition (RICS 1981/84).