Image from Google Jackets

Definition of prime cost of daywork carried out under a heating, ventilating air conditioning, piping and domestic engineering contract

By: Language: English Publication details: London RICS 1968Description: 4p. 21cmSubject(s): LOC classification:
  • 692.8 $2 18
Summary: SUPERSEDED: Replaced by 2nd edition (RICS 1980/24).

SUPERSEDED: Replaced by 2nd edition (RICS 1980/24).