Image from Google Jackets

Construction project delay analysis

By: Language: English Series: Cost Engineering ; 38(3) March 1996, 23-27(5)Publication details: 1996Subject(s): Summary: Outlines the procedure for analysing why and how a project came to be delayed.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS55064 (Browse shelf(Opens below)) 1 Available 13918-1001

Outlines the procedure for analysing why and how a project came to be delayed.